前, 要設定延遲翻譯時間, 如100表示100ms,默認為0 var cookieDomain = "http://www.austindineronline.com"; //Cookie地址, 一定要設定, 通常為你的網址 var msgToTraditionalChinese = "繁體"; //默認切換為繁體時顯示的中文字符 var msgToSimplifiedChinese = "簡體"; //默認切換為簡體時顯示的中文字符 var translateButtonId = "translateLink"; //默認互換id translateInitilization(); } // function Trim(str){return str.replace(/(^\s*)|(\s*$)/g,"");} function checknull(){if(Trim(searchform.searchword.value)=="" || Trim(searchform.searchword.value)=="请输入关键字"){alert("请输入关键字!");searchform.searchword.focus();return false;}else{return true;}} // //var params = {"XOffset":-1,"YOffset":-1,"width":160,"fontColor":"#222","fontColorHI":"#000","fontSize":"12px","fontFamily":"Microsoft YaHei","borderColor":"#CCC","bgcolorHI":"#EEE","sugSubmit":false}; //BaiduSuggestion.bind("searchword",params);
Longcheng Minyun
Affordable Housing Services
  • Affordable housing
  • Public rental housing
  • Commodity house
    Affordable Housing Application Guide More ...
    Affordable housing housing application review qualification confirmation registration
    Basic Information
      
    Basic coding: 070657400000
    Implementation coding: 45020000000010760312XP000070657400000
    Event type: Administrative confirmation Source of power: Legal authorization, regulatory authorization
    Implementation subject: Municipal Housing and Construction Bureau Implementation subject nature: Statutory authority
    Organizer: Liuzhou Residential Construction Committee
    Number of visits: 1 time Tolerance: no
    Application method: On-site application, online application Application form: Online application, window application, window application
    Implementation object: Families applying for affordable housing  
    Implementation object nature: Natural person Office type: Commitment
    Exercise level: City level General scope: Not interoperable
    Quantitative restrictions: no For public notice: Online publicity, on-site publicity, newspaper publicity
    Annual inspection or annual review: No annual review or annual inspection required For progress inquiry: Online Enquiry
    Result name: no Sample result: Click to view
    Delivery method: On-site inspection delivery
    Statutory closing time: Commitment time limit 90
    Location: Reception Hall, First Floor, No. 11, Zhongshan East Road, Chengzhong District, Liuzhou Application window: no
    Processing time: Working day: 8: 00-12: 00, 15: 00-18: 00
    traffic control: Take 14, 30, 69 to Dongmen Station and walk 100 meters
    Monitor telephone: 0772-2620002 support hotline: 0772-8855357
    Joint agency
    (Lead unit):
    Municipal Construction Committee Joint agency
    (Cooperating unit):
    no
    Operating system: Liuzhou Housing Security Information System, Autonomous Region Government Service Universal Software System
    Setting basis
    "Administrative Measures for Affordable Housing" (December 1, 2007, the Ministry of Construction, the National Development and Reform Commission, the Ministry of Supervision, the Ministry of Finance, the Ministry of Land and Resources, the People's Bank of China, the State Administration of Taxation and other seven departments jointly issued housing construction [2007 ] No. 258) Article 26. The application for the qualification for affordable housing shall be determined by the street office (town people's government), city (district), and county people's government through level review and publicity. The review unit shall verify the applicant's family income and housing status through household surveys, neighborhood visits, and letter request. The applicant and relevant units, organizations or individuals shall cooperate and provide relevant information truthfully. Article 27 For families that have passed the examination and publicity, the competent department of affordable housing of the municipal and county people's governments shall issue a notice of approval approving the purchase of affordable housing, stating the area standard for purchase. Waiting will be based on factors such as income level, housing difficulty and application order.
    Division of authority
    "Administrative Measures for Affordable Housing" (December 1, 2007, the Ministry of Construction, the National Development and Reform Commission, the Ministry of Supervision, the Ministry of Finance, the Ministry of Land and Resources, the People's Bank of China, the State Administration of Taxation and other seven departments jointly issued housing construction [2007 ] No. 258) Article 26. The application for the qualification for affordable housing shall be determined by the street office (town people's government), city (district), and county people's government through level review and publicity. The review unit shall verify the applicant's family income and housing status through household surveys, neighborhood visits, and letter request. The applicant and relevant units, organizations or individuals shall cooperate and provide relevant information truthfully. Article 27 For families that have passed the examination and publicity, the competent department of affordable housing of the municipal and county people's governments shall issue a notice of approval approving the purchase of affordable housing, stating the area standard for purchase. Waiting will be based on factors such as income level, housing difficulty and application order.
    Exercise content
    The principle of territorial jurisdiction, with districts and municipalities responsible for the review and confirmation of qualifications for the application of affordable housing in their respective administrative regions.
    Conditions of implementation
    Article 24 Low-income families in our city applying for purchasing affordable housing shall meet the following conditions at the same time: (1) Migrant workers with urban hukou in Liuzhou City or living in Liuzhou City for three years or more (2) The per capita annual income of the subscribed family is lower than the annual per capita disposable income of Liuzhou in the previous year (inclusive); (3) The per capita housing construction area of the subscribed family is less than 25 square meters (inclusive); (4) the single family applies for purchase For affordable housing, the applicant must not be less than 25 years old (inclusive); families renting municipally-managed public housing, low-rent housing, or public-rental housing must withdraw from the originally rented municipal-managed public housing, low-rent housing before applying for a real estate certificate Public rental housing. .
    Application materials
    Serial number Application Material Name Application materials basis Material type (original / copy) Do you need electronic materials Servings specification Necessity and
    description
    Source channel Signature visa requirements Whether tolerable Sample table (empty table)
    download
    Remark
    1 Application Form for Affordable Housing in Liuzhou "Administrative Measures for Affordable Housing in Liuzhou City" (Liu Zhengfa [2012] No. 56) Article 30 Original no 1 A4 paper necessary Liuzhou Construction Network-office service-form download Signature of main applicant no
    2 Household register, family membership, marriage certificate "Administrative Measures for Affordable Housing in Liuzhou City" (Liu Zhengfa [2012] No. 56) Article 30 Original no 1 A4 paper necessary Prepared by the applicant no no
    3 Proof of last year's income "Administrative Measures for Affordable Housing in Liuzhou City" (Liu Zhengfa [2012] No. 56) Article 30 Original no 1 A4 paper necessary Prepared by the applicant no no
    4 Residence permit "Administrative Measures for Affordable Housing in Liuzhou City" (Liu Zhengfa [2012] No. 56) Article 30 Original no 1 A4 paper necessary Prepared by the applicant Community signature no
    5 Certificate of social security payment for more than three years "Administrative Measures for Affordable Housing in Liuzhou City" (Liu Zhengfa [2012] No. 56) Article 30 Original no 1 A4 paper necessary Prepared by the applicant no no
    6 Major types of diseases, disability certificates, and preferential treatment cards defined by the medical insurance "Administrative Measures for Affordable Housing in Liuzhou City" (Liu Zhengfa [2012] No. 56) Article 30 Original no 1 A4 paper necessary Prepared by the applicant no no
    Special approval link
    Serial number Link name Implementation basis Closing time
    1 no 0 working days
    Intermediary service
    Serial number service name Before or after Implementation basis
    1 no
    Review methods and standards
    I. Review method: written review. The standards are as follows: (1) Examination criteria for the application (form) 1. The applicant shall truthfully fill in all the contents, be responsible for the authenticity and completeness of the submitted materials, and shall not make up, forge or fabricate the facts; 2. The instrument shall use a pen Fill in or print with ink that can maintain the handwriting for a long time, so that the handwriting is clear, the text is standardized, and the writing is clean and tidy, and must not be altered. The columns set in the document should be completed and accurate one by one; 3. The forms in the application materials should be printed on the front of the international standard A4 or A3 paper; 4. The relevant application forms should be completed by the counterparty and the applicant It shall be signed and affixed with the official seal of the unit. If there is no unit seal, it shall be signed by the person in charge of the unit. (II) Examination standards for photocopies of certification documents 1. Other submitted materials shall be printed, copied or bound in accordance with the specifications of A4 paper; 2. "Certificate", "ID Card Copies" "And so on are all photocopies, signed and dated by the applicant, and the accepting personnel shall check on-site whether the photocopies are consistent with the original; 3. The materials provided by the applicant or unit shall be complete and conform to the legal form. Second, the review method: field inspection. The standards are as follows: The application for the qualification for affordable housing shall be determined by the street office (town people's government), city (district) and county people's government through level review and publicity. The review unit shall verify the applicant's family income and housing status through household surveys, neighborhood visits, and letter request. The applicant and relevant units, organizations or individuals shall cooperate and provide relevant information truthfully. See Annex 2-4 for details.
    Procedure
    Link step Handler Processing time Processing time limit What to do Results
    Application and acceptance Receive Staff of the Municipal Housing Security Center 0 Receive on the spot Accept the application materials and submit them on the spot if the materials are complete; if the materials submitted are incomplete or do not meet the requirements, please complete them; there are errors that can be corrected on the spot and the applicant can correct them on the spot. One-time acceptance notice
    Application and acceptance Accept Staff of the Municipal Housing Security Center 0 Accept on the spot Whether the application materials are complete and meet the legal form and relevant requirements, and whether to accept the decision. Receipt
    Review and decision Review Staff of the Municipal Housing Security Center 60 no Municipal Housing Security Center staff review application materials Application Form Seal
    Review and decision Decide Municipal Housing and Construction Committee staff 30 no Determine compliance or non-compliance based on review opinions Publicity of audit results
    Certificate production and delivery Certificate Municipal Housing and Construction Committee staff 3 Not counting processing time The approved list is publicized on the official website of the Municipal Housing and Construction Committee Announcement on the results of the XX annual affordable housing lottery
    Certificate production and delivery service Municipal Housing and Construction Committee staff 3 Not counting processing time The approved list is publicized on the official website of the Municipal Housing and Construction Committee Announcement on the results of the XX annual affordable housing lottery
    flow chart 1.Affordable housing housing application review qualification confirmation flow chart.doc ( click here to download )  
    Charges
    Whether to charge or not
    Make an appointment
    Whether to make an appointment
    Common problems and precautions
    1. What kind of situation can be prioritized? Article 29 Applicants who have been approved and meet one of the following conditions shall be given priority in the sale of affordable housing: (1) elderly people over 70 years of age; (2) suffering from major diseases (major diseases defined by medical insurance, must have cities and counties) Certificate of Illness of a Grade-A Hospital); (3) suffering from a disability; (4) key priority care recipients who enjoy regular state pension benefits;
    Liability matters
    1. Responsibility for acceptance: The family applying for the application shall apply to the affordable housing acceptance department in accordance with the above provisions, truthfully fill out the "Application Form for Residents of Liuzhou City to Purchase Affordable Housing," and submit relevant materials 2. Review responsibility: After being submitted by the competent housing department, The report materials completed the review of family population, housing area, and family income. If it meets the purchase conditions, it will be publicized on the website of the Municipal Housing and Urban-Rural Development Commission. 3. Responsibilities at the decision stage: Applicants who meet the application conditions should be publicized. If there is no objection or the objection is not established after the publicity, they will be registered as economically suitable housing candidates. And open to society. Applicants who do not meet the application requirements shall be notified in writing and explained the reasons. 4. Responsibility during delivery stage: Production and delivery of registration certificate and information disclosure. 5. Post-event supervision responsibility: Establish and improve a supervision system to perform supervision responsibilities "6. Other duties: responsibilities stipulated by laws, regulations and policies.
    Accountability
    Due to non-performance or improper performance of administrative duties, the administrative agency and relevant staff shall bear the corresponding responsibilities in the following circumstances: 1. Failure to accept or fail to meet the statutory registration conditions, and acceptance and processing that do not meet the statutory registration conditions. 2. Failure to perform or incorrectly perform the right to register and approve the qualifications for affordable housing, resulting in adverse consequences. 3. Negligence or dereliction of duty in the review and supervision. 4. In the record, there are corruption acts such as banquets, money and things. 5. Responsibilities stipulated in other laws and regulations.
    Administrative Reconsideration
    Citizens, legal persons or other organizations who believe that a specific administrative action violates their legitimate rights and interests may, within 60 days from the date of knowing the specific administrative action
    Administrative Litigation
    1. Citizens, legal persons or other organizations who are not satisfied with the reconsideration decision may file a lawsuit in a people's court within 15 days of receiving the reconsideration decision. If the reconsideration organ does not make a decision within the time limit, the applicant may file a lawsuit in a people's court within 15 days from the expiration of the reconsideration period. 2. Citizens, legal persons, or other organizations that bring a lawsuit directly to a people's court shall, from the date when they know or should know, take administrative action.
    Remark Information
    no
    FAQ More ...
    Public rental housing needs unified application, unified review, and uniform waiting. There is currently no new batch of public rental housing applications in our city. If there are new batches of public rental housing applications, the Municipal Housing and Construction Bureau will issue announcements in relevant media (such as "Guangxi Zhuang Autonomous Region Government Information Disclosure Unified Platform", "Liuzhou Housing and Urban-Rural Construction Bureau Website", etc.) And prepare materials in accordance with the requirements of the announcement and apply to the community.
    Public rental housing. More ...
    Eligibility Registration for Public Rental Housing Application Review
    Basic Information
      
    Basic coding: 070657100000
    Implementation coding: 45020000000000760312XP000070657100000
    Event type: Administrative confirmation Source of power: Legal authorization, regulatory authorization
    Implementation subject: Municipal Housing and Construction Bureau Implementation subject nature: Statutory authority
    Organizer: Municipal Construction Committee
    Number of visits: 1 time Tolerance: no
    Application method: On-site application, online application Application form: Window handling
    Implementation object: Citizens, legal persons or other organizations applying for public rental housing  
    Implementation object nature: Legal person, other organization Office type: Commitment
    Exercise level: City level General scope: Not interoperable
    Quantitative restrictions: no For public notice: Online publicity, on-site publicity, newspaper publicity
    Annual inspection or annual review: Annual inspection For progress inquiry: Telephone inquiry
    Result name: About the announcement of the results of the annual public rental housing application review Sample result: Click to view
    Delivery method: On-site inspection delivery
    Statutory closing time: 15 Commitment time limit 15
    Location: Reception Hall, 1st Floor, No. 11, Zhongshan East Road, Chengzhong District, Liuzhou City Application window: no
    Processing time: Working day: 8: 00-12: 00, 15: 00-18: 00
    traffic control: You can take No. 14, 30, 66 to Dongmen bus and walk for 100 meters.
    Monitor telephone: 0772-2620002 support hotline: 0772-2809430
    Joint agency
    (Lead unit):
    Municipal Construction Committee Joint agency
    (Cooperating unit):
    no
    Operating system: Autonomous region government service general software system, Liuzhou housing security information system
    Setting basis
    [Regulations] "Administrative Measures for Public Rental Housing" (promulgated by the 84th Executive Meeting of the Ministry of Housing and Urban-Rural Development, May 28, 2012, Ministry of Housing and Urban-Rural Development Order No. 11) According to the regulations of the competent department of housing security of the county-level people's government, submit application materials and be responsible for the authenticity of the application materials. The applicant shall agree in writing to the municipal and county-level people's government housing security authorities to verify their declaration information. Where the application materials submitted by the applicant are complete, the competent department of housing security of the municipal and county-level people's governments shall accept them and issue written vouchers to them; if the application materials are incomplete, they shall notify the applicant in writing of the materials that need to be corrected. For the construction of public rental housing that is leased to employers or employees in the park in development zones and parks, the employers may apply on behalf of their employees. Article 9 The competent department of housing security of the municipal and county-level people's governments shall review the application materials submitted by the applicant together with the relevant departments. Upon review, applicants who meet the application requirements shall be publicly disclosed. If there is no objection or the objection is not established after the publicity, they shall be registered as public rental housing candidates and disclosed to the public. Applicants who do not meet the application conditions shall be notified in writing. And explain why. Applicants who disagree with the results of the review may apply to the housing security department of the municipal or county-level people's government for review. The municipal and county-level people's government housing security authorities shall review with the relevant departments and notify the applicant of the review results in writing within 15 working days.
    Division of authority
    [Regulations] "Administrative Measures for Public Rental Housing" (promulgated by the 84th Executive Meeting of the Ministry of Housing and Urban-Rural Development, May 28, 2012, Ministry of Housing and Urban-Rural Development Order No. 11) According to the regulations of the competent department of housing security of the county-level people's government, submit application materials and be responsible for the authenticity of the application materials. The applicant shall agree in writing to the municipal and county-level people's government housing security authorities to verify their declaration information. Where the application materials submitted by the applicant are complete, the competent department of housing security of the municipal and county-level people's governments shall accept them and issue written vouchers to them; if the application materials are incomplete, they shall notify the applicant in writing of the materials that need to be corrected. For the construction of public rental housing that is leased to employers or employees in the park in development zones and parks, the employers may apply on behalf of their employees. Article 9 The competent department of housing security of the municipal and county-level people's governments shall review the application materials submitted by the applicant together with the relevant departments. Upon review, applicants who meet the application requirements shall be publicly disclosed. If there is no objection or the objection is not established after the publicity, they shall be registered as public rental housing candidates and disclosed to the public. Applicants who do not meet the application conditions shall be notified in writing. And explain why. Applicants who disagree with the results of the review may apply to the housing security department of the municipal or county-level people's government for review. The municipal and county-level people's government housing security authorities shall review with the relevant departments and notify the applicant of the review results in writing within 15 working days.
    Exercise content
    [Regulations] "Administrative Measures for Public Rental Housing" (promulgated by the 84th Executive Meeting of the Ministry of Housing and Urban-Rural Development, May 28, 2012, Ministry of Housing and Urban-Rural Development Order No. 11) According to the regulations of the competent department of housing security of the county-level people's government, submit application materials and be responsible for the authenticity of the application materials. The applicant shall agree in writing to the municipal and county-level people's government housing security authorities to verify their declaration information. Where the application materials submitted by the applicant are complete, the competent department of housing security of the municipal and county-level people's governments shall accept them and issue written vouchers to them; if the application materials are incomplete, they shall notify the applicant in writing of the materials that need to be corrected. For the construction of public rental housing that is leased to employers or employees in the park in development zones and parks, the employers may apply on behalf of their employees. Article 9 The competent department of housing security of the municipal and county-level people's governments shall review the application materials submitted by the applicant together with the relevant departments. Upon review, applicants who meet the application requirements shall be publicly disclosed. If there is no objection or the objection is not established after the publicity, they shall be registered as public rental housing candidates and disclosed to the public. Applicants who do not meet the application conditions shall be notified in writing. And explain why. Applicants who disagree with the results of the review may apply to the housing security department of the municipal or county-level people's government for review. The municipal and county-level people's government housing security authorities shall review with the relevant departments and notify the applicant of the review results in writing within 15 working days.
    Conditions of implementation
    "Administrative Measures for Public Rental Housing" (promulgated by the 84th executive meeting of the Ministry of Housing and Urban-Rural Development, and promulgated by Order No. 11 of the Ministry of Housing and Urban-Rural Development of May 28, 2012) Article 7 Applications for public rental housing shall meet the following requirements: Conditions: (1) There is no housing in the local area or the housing area is lower than the required standard; (2) The income and property are lower than the required standard; (3) If the applicant is a migrant worker, the local stable employment has reached the required period of time. The specific conditions shall be determined by the competent housing security authorities of the municipalities, municipalities and county-level people ’s governments based on the actual conditions in their respective regions, and they shall be implemented after being reported to the people ’s governments at the same level and announced to the public.
    Application materials
    Serial number Application Material Name Application materials basis Material type (original / copy) Do you need electronic materials Servings specification Necessity and
    description
    Source channel Signature visa requirements Whether tolerable Sample table (empty table)
    download
    Remark
    1 Application Form for Public Rental Housing in Liuzhou "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Liuzhou Construction Network-office service-form download Signature of main applicant no
    2 Original ID card and household registration book "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant no no
    3 Proof of Marital Status "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant no no
    4 Proof of income Original no 1 A4 paper necessary "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Unit seal or signature no
    5 Community consultation materials "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant Community signature no
    6 Diploma of technical secondary school "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant no no
    7 Certificate of local police station "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant no no
    8 Residence permit "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant no no
    9 Labor contract and social security payment certificate "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant no no
    10 Major types of diseases, disability certificates, and preferential treatment cards defined by the medical insurance "Administrative Measures for Public Rental Housing in Liuzhou City" (Liu Zhengban [2014] No. 162) Chapter 32 Original no 1 A4 paper necessary Prepared by the applicant no no
    Special approval link
    Serial number Link name Implementation basis Closing time
    1 Publicity "Liuzhou Public Rental Housing Management Measures" (Liu Zhengban [2014] No. 162) 7 working days
    Intermediary service
    Serial number service name Before or after Implementation basis
    1 no
    Review methods and standards
    Written review; "Liuzhou Municipal Public Rental Housing Administrative Measures" (Liu Zhengban [2014] No. 162) I. Review method: Written review. The standards are as follows: (1) Examination criteria for the application (form) 1. The applicant shall truthfully fill in all the contents, be responsible for the authenticity and completeness of the submitted materials, and shall not make up, forge or fabricate the facts; 2. The instrument shall use a pen Fill in or print with ink that can maintain the handwriting for a long time, so that the handwriting is clear, the text is standardized, and the writing is clean and tidy. The columns set in the document should be completed and accurate one by one; 3. The forms in the application materials should be printed on the front of the international standard A4 or A3 paper; 4. The relevant application forms should be completed by the counterparty and the applicant It shall be signed and affixed with the official seal of the unit. If there is no unit seal, it shall be signed by the person in charge of the unit. (II) Examination standards for photocopies of certification documents 1. Other submitted materials shall be printed, copied or bound in accordance with the specifications of A4 paper; 2. "Certificate", "ID Card Copies" "And so on are all photocopies, signed and dated by the applicant, and the accepting personnel shall check on-site whether the photocopies are consistent with the original; 3. The materials provided by the applicant or unit shall be complete and conform to the legal form. See Annex 2-4 for details
    Procedure
    Link step Handler Processing time Processing time limit What to do Results
    Application and acceptance Accept Community worker 0 no 1. Receive the application materials. If the materials submitted are complete, they will be accepted on the spot. If the materials submitted are incomplete or do not meet the requirements, please complete them. The submitted materials have errors that can be corrected on the spot, and the applicant can correct them on the spot. 2. Whether the application materials are complete and meet the legal form and relevant requirements, and decide whether to accept or not. 1. One-time acceptance notice; 2. Receipt of receipt
    Review and decision Review 1. Street staff 2. Staff of the Urban Construction and Housing Bureau 3. Staff of the Municipal Housing Security Center 50 1. Street review 20 working days 2. Urban housing construction bureau review 15 working days 3. Municipal housing security development center review 14 working days 4.1 working days 1. If the street office meets the requirements, the relevant information of the applicant family will be entered into the municipal housing security system. 2. The application materials will be reviewed. If they meet the conditions, they will sign the review opinions and submit the materials to the municipal housing security department. If the review does not meet the requirements, inform the applicant in writing and explain the reasons. 3. The municipal housing security department shall review the eligible conditions within 15 working days from the date of receipt of the application materials submitted by the urban housing security department. It will be publicized on the security network and the mainstream media in this city, and the publicity period is 7 days. If there is no objection after the announcement or the objection is not established, the review result is the final review opinion; if there is an objection and the objection is established during the publicity period, the applicant's qualification for application is cancelled, the applicant is notified in writing and the reason is stated. Seal of application form; publicity of audit results
    Certificate production and delivery service Municipal Housing and Construction Committee staff 3 Not included in the processing time Publicize the applicants on the website of the Housing and Construction Commission Announcement on the results of the XX year public rental housing lottery announcement
    flow chart 1. Attachment 1: Flow chart of registration and qualification confirmation of public rental housing application.doc ( click here to download )  
    Charges
    Whether to charge or not
    Make an appointment
    Whether to make an appointment
    Common problems and precautions
    1 When an applicant selects a public rental housing, if one of the following situations occurs, it is deemed as giving up the rent allocation qualification and re-waiting: (1) failing to participate in the housing selection as required; (2) the housing has been selected but not within the prescribed time Sign a lease contract; (3) Failure to complete check-in formalities within 30 days after signing the lease contract; (4) Other circumstances that give up the qualification for rent allocation. If the applicant family has given up the rent allocation twice, the waiting will be cancelled and the application shall be resubmitted.
    Liability matters
    1. Responsibility for acceptance: publicize the materials that should be submitted in accordance with the law; inform and correct the materials once; accept or reject them in accordance with the law (the reasons should be informed if they are not accepted). 2. Responsibility at the review stage: review the materials and review the application materials submitted by the applicant together with relevant departments. ;. 3. Responsibilities at the decision stage: Applicants who meet the application requirements should be publicly disclosed. If there is no objection or the objection is not established after the publicity, they shall be registered as the public rental housing waiting list, and the applicants who do not meet the application conditions shall be disclosed to the public. Written notice and reasons. 4. Responsibility at the delivery stage: Production and delivery of registration certificate and information disclosure. 5. Post-event supervisory responsibility: establish and improve a supervisory system to perform supervisory responsibilities. "6. Other responsibilities: responsibilities required by laws, regulations and policies.
    Accountability
    Due to non-performance or improper performance of administrative duties, the administrative agency and relevant staff shall bear the corresponding responsibilities in the following circumstances: 1. Failure to accept or fail to meet the statutory registration conditions, and acceptance and processing that do not meet the statutory registration conditions. 2. Failure to perform or incorrectly perform the right to register and approve the qualifications for public rental housing applications, resulting in adverse consequences. 3. Negligence or dereliction of duty in the review and supervision. 4. In the record, there are corruption acts such as banquets, money and things. 5. Responsibilities stipulated in other laws and regulations.
    Administrative Reconsideration
    Citizens, legal persons or other organizations may know that a specific administrative act infringes their legitimate rights and interests by themselves
    Administrative Litigation
    1. Citizens, legal persons or other organizations who are not satisfied with the reconsideration decision may file a lawsuit in a people's court within 15 days of receiving the reconsideration decision. If the reconsideration organ does not make a decision within the time limit, the applicant may file a lawsuit in a people's court within 15 days from the expiration of the reconsideration period. 2. Citizens, legal persons or other organizations that directly file suits with people's courts should know or should know to make administrative decisions.
    Remark Information
    no
    FAQ More ...

    、什么是经济适用住房? 1. What is affordable housing?

    A: Affordable housing refers to policy-provided housing that is provided by the government with preferential policies, limited sets of flats and sales prices, and is constructed in accordance with reasonable standards.

    、经济适用住房的销售价格是多少? 2. What is the sales price of affordable housing?

    2503号)在经济适用住房项目销售前确定销售价格,并向社会公布。 A: The government-guided price is adopted for the sale of affordable housing, and the municipal competent department of price in conjunction with the municipal affordable housing department shall apply economically in accordance with the State Planning Commission and the Ministry of Construction's "Administrative Measures for the Price of Affordable Housing" (calculated price [ 2002 ] 2503 ) Before the housing project is sold, the sales price is determined and announced to the society.

     

    、如何申请经济适用住房? 3. How to apply for affordable housing?

    A: Within the acceptance period of affordable housing, fill in the application form for affordable housing at the housing management office and submit relevant materials.

    、什么时候可以申请经济适用住房? 4. When can I apply for affordable housing?

    A: Please pay attention to the announcement of the acceptance time of news media (Liuzhou Daily Evening News, New Broadcasting, etc.), Liuzhou Housing Security Network and the notice board of affordable housing projects of the Office of Housing and Construction Committee.

    、经济适用住房可以上市交易吗? 5. Can affordable housing be traded on the market?

    Answer: Affordable housing buyers have limited property rights.

    %计算。 If the purchase of affordable housing is less than 5 years old, it shall not be directly listed and traded. If the buyer really needs to transfer affordable housing due to special reasons, the municipal affordable housing department shall repurchase according to the original price and consider depreciation and price levels and other factors. The price is calculated based on the original purchase price deducting 1 % every year from the date of purchase.

    年,购房人上市转让经济适用住房的,须按照届时该住房市场评估价与原购经济适用住房价差价部分的30%向政府交纳土地收益等相关价款,如市场评估价低于原购经济适用住房价的,不需补交。 After purchasing the affordable housing for 5 years, if the buyer purchases and transfers the affordable housing on the market, he must pay the government the relevant land price and other related prices, such as the market assessment price, according to 30% of the difference between the market price of the housing market and the original affordable housing If the price is lower than the original affordable housing price, no additional payment is required.
    Commodity house with limited price More ...
    Qualification review of limited commodity housing
    Basic Information
     
    Basic coding: 102379900000
    Implementation coding: 45020000000000760312XP000102379900000
    Event type: Other powers Source of power: Regulatory documents
    Implementation subject: Municipal Housing and Construction Bureau Implementation subject nature: Statutory authority
    Organizer: Housing Reform Office of Liuzhou Housing and Urban-Rural Development Committee
    Number of visits: 1 time Tolerance: no
    Application method: On-site application Application form: Online application, window application, window application after online pre-examination
    Implementation object: Citizens who apply to the Municipal Housing and Construction Committee for the qualification review of purchase of limited-price commercial housing  
    Implementation object nature: Natural person Office type: Commitment
    Exercise level: City level General scope: Not interoperable
    Quantitative restrictions: no For public notice: Online publicity
    Annual inspection or annual review: No annual review or annual inspection required For progress inquiry: Online inquiry Phone inquiry
    Progress query URL: (Integrated Online Government Service Platform of the Region) http://221.7.197.46/govcenter/projBasicInfo.do?method=redirectIndex&gscPlace=Lzszf Phone for progress consultation: 0772-2821590
    Result name: XXX Announcement of Qualification Review Sample result: Click to view
    Delivery method: Email delivery
    Statutory closing time: 20 Commitment time limit 10
    Location: Liuzhou Municipal Service Center Application window: Residential Construction Committee window
    Processing time: Working days: 9: 00-12: 00 am, 13: 00-16: 00 pm
    traffic control: You can take bus No. 34, 54, 59, 69, 70, 75, 78, 90, 101 to Civic Plaza and Municipal Service Center Station
    Monitor telephone: 0772-2825278 support hotline: 0772-2821590
    Joint agency
    (Lead unit):
    no Joint agency
    (Cooperating unit):
    no
    Operating system: (Integrated Online Government Service Platform of the Region) http://221.7.197.46/govcenter/projBasicInfo.do?method=redirectIndex&gscPlace=Lzszf
    Setting basis
    1. [Normative Documents] "Notice of the General Office of the State Council on Promoting the Stable and Healthy Development of the Real Estate Market" (9): "... To accelerate the construction of price-limited commodity housing and public rental housing, and to solve the housing difficulties of lower-middle income families." 2. [Normative Documents] "Interim Measures for the Administration of Affordable Housing in Guangxi" (Guizhengbanfa [2013] No. 77 issued on July 30, 2013) Article 37: "The allocation of affordable housing shall be implemented in" three trials and two trials " "Public notice" system .... If the conditions are met, the local housing security authority conducts the third comprehensive review of the information obtained in the previous two reviews, and draws up a list of qualified persons to participate in the distribution within 5 working days. After the third review, The list of qualified applicants will be publicized on the website of the local government or the website of the competent department of housing security. "3. [Normative Documents]" Liuzhou City Price-limited Commodity Housing Management Measures "(Liu Zhengjian [2018] No. 43) No. 21 Article: "After the deadline for the centralized acceptance of home purchase applications, development and construction units shall submit the application materials to the Municipal Housing Security Development Center for preliminary examination. The preliminary examination shall conclude Be Chadang evidence, letters cable card, etc., to purchase the applicant and the relevant units shall cooperate. City housing security center should develop a preliminary opinion and submitted to the Municipal Housing and Urban-Rural Construction Committee review. "
    Division of authority
    [Normative Documents] "Interim Measures for the Administration of Affordable Housing in Guangxi" (Guizhengbanfa [2013] No. 77, issued on July 30, 2013) Article 3 The people's government of the city, county (city, district) is responsible for the area Construction and management of affordable housing. Article 37 The distribution of affordable housing is subject to the "three trials and two public announcements" system. The first is to apply to the local street (township people's government), and the street office (township people's government) conducts the first review of the applicant's situation, and publicize the situation in the street and community where they live within 20 working days. The duration is 5 days. During the publicity period, no objection was received, and the sub-district office (township people's government) will submit the review opinions and application materials to the county-level housing security authority, and it will work with civil affairs, public security, industry and commerce, taxation, and provident fund management at the same level. The department conducted a second review of the applicant's family financial status (family income status, family property status), etc. in accordance with relevant regulations and procedures. If the conditions are met, the local housing security authority will conduct a third comprehensive review of the information obtained in the previous two reviews, and draw up a list of qualified persons to participate in the distribution within 5 working days. After the third review, the list of eligible applicants will be published on the website of the local government or the website of the competent department of housing security.
    Exercise content
    [Normative Documents] "Interim Measures for the Administration of Affordable Housing in Guangxi" (Guizhengbanfa [2013] No. 77, issued on July 30, 2013) Article 3 The people's government of the city, county (city, district) is responsible for the area Construction and management of affordable housing. Article 37 The distribution of affordable housing is subject to the "three trials and two public announcements" system. The first is to apply to the local street (township people's government), and the street office (township people's government) conducts the first review of the applicant's situation, and publicize the situation in the street and community where they live within 20 working days. The duration is 5 days. During the publicity period, no objection was received, and the sub-district office (township people's government) will submit the review opinions and application materials to the county-level housing security authority, and it will work with civil affairs, public security, industry and commerce, taxation, provident fund management, etc. The department conducted a second review of the applicant's family financial status (family income status, family property status), etc. in accordance with relevant regulations and procedures. If the conditions are met, the local housing security authority will conduct a third comprehensive review of the information obtained in the previous two reviews, and draw up a list of qualified persons to participate in the distribution within 5 working days. After the third review, the list of eligible applicants will be published on the website of the local government or the website of the competent department of housing security.
    Conditions of implementation
    [Normative Documents] "Administrative Measures on Liuzhou City's Price-Limited Commodity Housing Management" (Liu Zhengjian [2018] No. 43) Article 14 Families applying for purchase of price-limited commodity housing must have household registration in or outside of Liuzhou However, living and working in Liuzhou City at the same time meet one of the following conditions: (1) In Liuzhou City, the per capita floor area of buildings without owning or owning housing is below 25 square meters, and has not purchased economically Applicable housing; (2) Other application conditions approved by the Municipal People's Government.
    Application materials
    Serial number Application Material Name Application materials basis Material type (original / copy) Do you need electronic materials Servings specification Necessity and
    description
    Source channel Signature visa requirements Whether tolerable Sample table (empty table)
    download
    Remark
    1 限价商品住房购房申请表 《柳州市限价商品住房管理办法》(柳政规〔2018〕43号) 原件 no 1 A4纸 necessary 受理点领取本人签名 no
    2 户口本和身份证 《柳州市限价商品住房管理办法》(柳政规〔2018〕43号) 复印件 no 1 A4纸 necessary 申请人自备 no 原件备查
    3 已婚的提供结婚证 《柳州市限价商品住房管理办法》(柳政规〔2018〕43号) 复印件 no 1 A4纸 necessary 申请人自备 no 原件备查
    4 非柳州市区范围内户籍的申请人,提供居住证或与柳州市企业、单位签订的劳动合同、进编证或社保清单 《柳州市限价商品住房管理办法》(柳政规〔2018〕43号) 复印件 no 1 A4纸 necessary 申请人自备 no 原件备查
    5 属于优先供应对象的申请人应提交相关资格材料 《柳州市限价商品住房管理办法》(柳政规〔2018〕43号) 复印件 no 1 A4纸 necessary 申请人自备 no 原件备查
    6 已享受廉租住房、公共租赁住房或已进入经济适用住房轮候的,需提交购房时自愿退出廉租住房、公共租赁住房或放弃经济适用住房轮候的书面承诺 《柳州市限价商品住房管理办法》(柳政规〔2018〕43号) 原件 no 1 A4纸 necessary 受理点领取本人签名 no
    7 经市人民政府批准的其他申购条件的,按批准条件提交材料 《柳州市限价商品住房管理办法》(柳政规〔2018〕43号) other no 1 A4纸 necessary no
    特殊审批环节
    该办件事项暂无特殊审批环节
    中介服务
    该办件事项暂无中介服务
    审查方式及标准
    一、审查方式:书面审查。标准如下: (一)申请表的审查标准1.申请人应如实填写各项内容,对提交材料的真实性、完整性负责,不得虚构、伪造或编造事实; 2.文书应使用钢笔和能够长期保持字迹的墨水填写或打印,做到字迹清楚、文字规范、文面整洁,不得涂改。文书设定的栏目,应逐项填写完整、准确; 3.申请材料中的表格应使用国际标准A4或A3型纸对开正面印制; 4.相关申请表格应由申请相对人、申请单位填写并本人签名。 (二)证明文件等复印件的审查标准1.其他各项提交的材料应使用国际标准A4型纸打印、复印或按照A4型纸的规格装订; 2.“证明文件”、“身份证复印件”等均为复印件,受理人员应现场核对复印件与原件是否一致; 3.申请个人提供的材料应齐全并符合法定形式。
    Procedure
    flow chart 1、附件1:限价普通商品住房资格审查流程图.docx( 点此下载 )  
    Charges
    是否收费 不收费
    Make an appointment
    是否预约 不可预约
    常见问题及注意事项
    【规范性文件】《柳州市限价商品住房管理办法》(柳政规〔2018〕43号)第十七条购房申请人不得同时申请购买两处及两处以上的限价普通商品住房。已享受廉租住房、公共租赁住房等其他住房保障或已进入经济适用住房轮候的,需承诺购房时自愿退出廉租住房、公共租赁住房等其他住房保障或放弃经济适用住房轮候。已购买限价商品房的家庭不得再次享受其他形式的保障性住房。 【规范性文件】《柳州市限价商品住房管理办法》(柳政规〔2018〕43号)第二十六条柳东新区、北部生态新区(阳和工业新区)辖区内的限价商品房,涉及的购买申请、资格审核等销售管理相关工作由各新区住房保障管理部门负责。 【规范性文件】《柳州市限价商品住房管理办法》(柳政规〔2018〕43号)第二十八条限价商品房自取得《不动产权证书》之日起5年内不得转让;限价商品房的抵押权人因购房家庭无力偿还购房贷款需要处置抵押物,根据法院判决或裁定以及协助执行通知书发生房屋所有权转移的,不受上市交易年限的限制。
    Liability matters
    1.受理责任:申购的家庭按上述规定向柳州市住房和城乡建设委提出申请,如实填写《XXX限价商品住房购房申请表》,并提交相关材料。 2.审核责任:经柳州市住房保障中心根据申请家庭交报的材料完成对家庭人口、住房面积等情况进行初审,并将初审结果报市住房和城乡建设委进行审批。 3.决定阶段责任:对符合申请条件的申请人,应当予以公示,经公示无异议或者异议不成立的,登记为限价商品住房有效购房人,并向社会公开。对不符合申请条件的申请人,应当书面说明理由。 4.送达阶段责任:信息公开。 5.事后监管责任:建立健全监督制度,履行监督责任。 6.其他责任:法律法规政策规定应履行的责任。
    追责情形
    因不履行或不正确履行行政职责,有下列情形的,行政机关及相关工作人员应承担相应责任: 1.符合法定登记条件的未受理、未办理的,不符合法定登记条件受理办理的。 2.不履行或不正确履行限价普通商品住房申请审核确认资格登记权力,造成不良后果的。 3.在审查监管中失职、渎职的。 4.在备案中有接受宴请、钱物等腐败行为的。 5.其他法律法规规章文件规定应履行的责任。
    Administrative Reconsideration
    公民、法人或者其他组织认为具体行政行为侵犯其合法权益的,可以自知道该具体行政行为之日起六十日内提出行政复议申请。
    Administrative Litigation
    1.公民、法人或者其他组织不服复议决定的,可以在收到复议决定书之日起十五日内向人民法院提起诉讼。复议机关逾期不作决定的,申请人可以在复议期满之日起十五日内向人民法院提起诉讼。 2.公民、法人或者其他组织直接向人民法院提起诉讼的,应当自知道或者应当知道作出行政行为之日起六个月内提出。
    Remark Information
    常见问题更多...

    1、什么叫公共租赁住房(简称公租房)?

    公共租赁住房,是指政府提供政策支持,由政府专门机构出资建设和运营,限定套型面积和出租价格,主要向城市中等偏下收入家庭及新生劳动者出租的具有保障性质的住房。

    申请公共租赁住房应当以家庭为单位,原则上以具有完全民事行为能力的户主作为申请人,不具有完全民事行为能力的申请人由其监护人代为申请。单身家庭申请的必须年满18周岁。

    2、申请公租房在什么情形下,可以认定为申请家庭有住房?

    (1)自有住房,包括自建私房,所购商品房、房改房、经济适用住房,参加集资建房、市场运作建7房,拆迁安置房(含待入住);

    (2)承租的市直管公房、公共租赁住房、廉租住房;

    (3)共同居住的直系亲属的自有住房。

    申请人的配偶及未成年子女应作为共同申请的家庭成员参与申请;离异家庭的未成年子女列入法定抚养方的家庭成员申请。夫妻双方未在同一户籍的,只能由一方作为申请人提出申请,另一方户籍所在街道办事处负责调查相关情况并提供相关证明。

    3、领取《柳州市公共租赁住房申请表》需带什么材料?

    中文字幕无线手机在线答:本市户籍人员领表时需本人提供身份证、户口本,不得代领;外地户籍人员提供暂住证(及两年社保证明),不得代领,也可自行登录柳州住房保障网下载打印。

    4、申请公租房保障对户籍有什么要求?

    答:具有本市市区城镇居民户籍家庭或取得本市《暂住证》(居住证)且在本市市区连续缴纳社保2年(含)以上的非本市市区城镇居民户籍家庭。

    5、申请公租房的家庭收入符合市政府公布的收入标准是多少?

    答:家庭户每月人均收入1500元(含)以下、单身户每月收入2000元(含)以下。

    中文字幕无线手机在线如家庭申请户一家三口为例:两夫妻月收入共计4000元/月,有一未成年子女,则其家庭月人均收入为4000/3=1333元,符合申请收入标准。

    6、申请人原与父母共同居住于父母名下产权房,是否可以申请?

    答:只要申请人及共同申请家庭成员(共同申请的家庭成员之间应具有法定的赡养、抚养或扶养关系)没有自有住房并符合其它三个申请条件。

    7、如果申请人符合申请标准,其外地户籍直系亲属(具有法定的赡养、抚养或扶养关系)实际在本市居住,只有暂住证却没有两年社保证明,如何申请?

    答:只要申请人符合申请标准,其外地户籍的直系亲属如果申请成为共住人,需提交暂住证及与主申请人的直系亲属关系证明。注:子女也应有暂住证,若子女属入幼儿园前可不提交暂住证,有关系证明即可。

    8、法律上的赡养,扶养,抚养是哪些亲属关系?

    答:赡养是指对上辈亲属应负的扶养义务,如父母,特殊情况的祖父、祖母、外祖父、外祖母等;

    中文字幕无线手机在线扶养指对同辈的亲属之间的扶助义务,如妻子、特殊情况的兄弟姐妹;

    抚养指对下辈的亲属之间的养育义务,如子女、特殊情况的孙子女(子女去世)、以及特殊情况的侄子女这类的。

    赡养,是指晚辈对长辈的,尤其体现在子女对父母的义务;扶养是同辈对同辈(兄弟姐妹之间),比如兄长对身体残疾、生活困难的弟弟的扶养费用;抚养是长辈对晚辈,如父母和子女,祖和孙,比如离婚案件中,需要协商孩子的抚养费;

    9、夫妻双方都符合申请条件,但处于办理离婚手续阶段,子女扶养权利未确定,应如何申请?

    答:申请当时若仍未离婚则按家庭户申请处理。

    10、申请人经核准且符合什么条件才可以优先分配住房?

    中文字幕无线手机在线申请人经核准且符合下列条件之一的,优先分配住房:

    (1)60岁以上的老人无法定赡养义务人,或虽有法定赡养义务人,但赡养义务人无劳动能力、无赡养能力、无生活来源的;

    (2)未成年人无法定抚养义务人,或虽有法定抚养义务人,但抚养义务人无劳动能力、无抚养能力、无生活来源的;

    (3)家庭中成员患有重大疾病(医保界定的重大疾病,须有市县级医院疾病证明书)丧失劳动能力,无生活来源的;

    中文字幕无线手机在线 (4)家庭中成员为残疾的特殊困难家庭;

    (5)享受国家定期抚恤补助的重点优抚对象家庭;

    (6)配合市政重点工程和保障性住房项目的被征收家庭。

    11、申请取得公租房资格的家庭是如何分配住房的?

    中文字幕无线手机在线答:一个家庭只能配租一套公共租赁住房。公共租赁住房分配应考虑申请家庭的人口及代际情况,按以下原则进行分配:

    (1)一人户配租单间;

    (2)二人户配租一房一厅;

    中文字幕无线手机在线 (3)三人(含三人以上)户配租两房一厅

    12、公共租赁住房租金标准是多少?

    答:公共租赁住房租金标准原则上按照成本租金测算,参照同地段市场租金标准的60%—80%确定。

    13、公共租赁住房承租人有何种行为可以解除租赁合同,收回公共租赁住房,其家庭五年内不得申请公共租赁住房?

    中文字幕无线手机在线答:公共租赁住房承租人有下列行为之一的,解除租赁合同,收回公共租赁住房,其家庭5年内不得申请公共租赁住房:

    中文字幕无线手机在线 (1)采取提供虚假证明材料等欺骗方式取得公共租赁住房的;

    中文字幕无线手机在线 (2)转租、出借的;

    中文字幕无线手机在线 (3)未经许可改变房屋结构或使用性质的;

    中文字幕无线手机在线 (4)房屋无正当理由连续空置3个月以上的;

    (5)拖欠租金累计3个月以上的;

    中文字幕无线手机在线 (6)违反租赁合同约定的。

Organizer: Liuzhou Big Data Development Bureau

GuiGong Network Security No. 45020502000014

Organizer: Liuzhou Municipal People's Government

Gui ICP No. 05009280

Management and maintenance: Liuzhou Information Construction Management Center

Website identification code: 4502000034